Underground Piping
Underground Copper Piping in Lahore
Underground and concealed AC copper piping in Lahore for new houses and renovations. Pipes laid in the wall or floor and leak-checked before covering.

In a new house or during renovation, the AC pipes can be laid inside the wall or under the floor, so nothing shows on the finished wall. Once the plaster or tile goes on, a leak is very hard to reach. So the pipe must be checked before it is covered.
What is included
- Pipe route planned with you for each AC point
- Insulated copper pipe laid in the wall or floor channel
- Drain pipe laid alongside with a slope
- Pipe ends sealed to keep out dust and water until the AC is fitted
- Joints checked for leaks before the pipe is covered
What may cost extra
We tell you about any of these before we start, never after.
- Cutting the wall or floor channel, if your builder has not done it
- Pipe is charged by the foot. We measure and tell you the length first
How the job goes
- 1Send us the house plan or photos and the number of AC points.
- 2We visit or measure, then tell you the rate and the pipe length.
- 3We lay the copper and drain pipe and seal the ends.
- 4We check for leaks before your builder closes the wall or floor.
From our jobs
Jobs we have done.

Pipes laid inside the wall 
Cutting the wall for concealed pipes
Your worries, our promise
What usually goes wrong with this job, and what we do about it.
“The bill was more than the rate I was told.”
The rate before we start, a written bill when we finish.
We tell you the rate for labour, pipe and any other material before we pick up a tool. If something changes, we ask you first. Your bill lists each item with its quantity and rate.
“Water drips down my wall after fitting.”
We test the drain with water before we leave.
Dripping usually means the drain pipe has no slope or is blocked. We lay it with a slope and pour water through it while you watch.
“Thin pipe goes in and leaks within a year.”
You see the copper pipe before it is fitted.
We show you the pipe and tell you its size before it goes on the wall. Every joint is checked for leaks before the pipe is covered.
“After I paid, nobody wanted to know.”
One number, before and after the job.
The WhatsApp number you book on is the same number that answers if something is not right later.
Questions
Common questions
When should underground piping be done?
Before plaster and before floor tiles. Call us while the grey structure is still open.
Can pipes be hidden in a finished house?
Yes, but the wall has to be cut and repaired. We tell you the work involved before we start.
What about the drain pipe?
It is laid at the same time, with a slope, so the water flows out on its own.
Book this job
Tell us about your AC.
Fill in the slip and it opens in WhatsApp, ready to send.
Related services
AC Copper Piping
New pipe runs, replacement and extensions
AC Drain Piping
Dripping units fixed, new drain lines
Split AC Installation
Wall mounted split units, fitted and tested
Need an AC fitted or fixed?
Send us the details on WhatsApp. You get the rate before any work starts.